|
|
TM 9-2320-302-20-2
RADIATOR REPLACEMENT - CONTINUED
0052 00
INSTALLATION - CONTINUED
8.
Install charge air cooler (14) on radiator (9) with two washers (3) and nuts (2).
9.
Install two screws (12), washers (13), and new locknuts (10) on charge air cooler (14).
10.
Position two hoses (6) and four clamps (1) on air intake tubes (7) and charge air cooler with condenser (14). Tighten
clamps.
11.
Install two screws (5), four washers (4), and two locknuts (11) on side shields (8).
7
1
14
6
5
2
4
3
10
1
8
9
13
10
12
4
11
12.
Install radiator support rod (WP 0051 00).
13.
Install expansion tank (WP 0050 00)
14.
Install water level probe (WP 0095 00).
15.
Install coolant hoses, pipes and clamps (WP 0047 00 or WP 0048 00).
16.
Install engine hood (WP 0242 00).
END OF WORK PACKAGE
0052 00-5/(-6 Blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |