Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-302-20-2
THERMOSTAT AND THERMOSTAT HOUSING COVER REPLACEMENT - CONTINUED
0049 00
INSTALLATION - CONTINUED
4
3
1
2
1
5
6
7
8
NOTE
Ensure that machined mating surfaces of thermostat housing cover and cylinder head are clean and dry.
9.
Install thermostat housing cover (2) on cylinder head (7) with four bolts (3). Tighten bolts to 43-54 lb-ft (58-73 Nm).
10.
Install coolant hoses, pipes, and clamps (WP 0047 00 or WP 0048 00).
END OF WORK PACKAGE
0049 00-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business