Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-302-20-2
COOLANT HOSES AND PIPES REPLACEMENT (M915A3 NEW MODEL,
M916A3, M917A2) - CONTINUED
0048 00
INSTALLATION - CONTINUED
7.
Install elbow hose (30), elbow pipe (27), and elbow hose (29) to engine oil cooler (31) and bottom of transmission oil
cooler (26) with four clamps (28).
8.
Install hose (25), elbow pipe (24), and elbow hose (23) to transmission oil cooler (26) and water pump (17) with four
clamps (22).
17  25
22
23
22
24
31
28
30
26
29
27
28
9.
Install pipe (21) and two hoses (20) to thermostat housing (8) and pipe (21) with four clamps (19).
10.
Lightly coat threads of adapter (16) with pipe sealing compound and install adapter and tube (18) to water pump (17).
11.
Install hose (14) to tube (18) of water pump (17) and bottom of coolant overflow reservoir (6) with two clamps (15).
6
14
21
15
19
8
20
19
18
17
16
0048 00-6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business