|
|
TM 5-2420-224-20-1
Table 3-5. Troubleshooting (Cont)
Malfunction
Test or Inspection
Corrective Action
BACKHOE (SEE) (CONT)
Step 2. Check for damaged swing cylinder packing as follows:
NOTE
The pin, 8-10 in. (200-250 mm) in length, 1-1/2 in. (37.5 mm) in diameter, must be made
from rolled stock.
a. Start engine. Place swing tower in center position and install pin (1)
through swing tower (2) and backhoe mounting frame (3) to hold swing
tower (2) in center position.
3-304
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |