|
|
TM 5-2420-224-20-1
Table 3-5. Troubleshooting (Cont)
Malfunction
Test or Inspection
Corrective Action
ELECTRICAL SYSTEM (CONT)
Step 11. Check wire (14) at D+ relay (7) for continuity to ground.
If short to ground, replace D+ relay.
If open to ground, repair wiring (14) between D+ relay and
ground at fuse box 1.
Step 12. Check for +24 VDC between wire (15) and ground at solenoid relay (13).
If +24 VDC is not present, repair wiring (15) between solenoid
relay and D+ relay.
If +24 VDC is present, go to step 13.
Step 13. Check for +24 VDC between wire (16) and ground at solenoid relay (13).
If +24 VDC is not present, repair wiring (16) at solenoid relay.
If +24 VDC is present, go to step 14.
Step 14. Check for +24 VDC between wire (17) and ground at indicator light (18).
If +24 VDC is not present, repair wiring (17) between solenoid
relay and indicator light.
If +24 VDC is present, go to step 15.
3-240
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |