|
|
TM
5-2420-224-20-1
Attach tow bar (1) to two clamps (2) using 1.0-in. (24.4-mm) pin and clevis assemblies (5),
5.
with clevis tipping upward.
Extend tow bar (1) enough to clear front loader (4) and tow vehicle when turning.
6.
7.
Attach lift chains (6) to front lift points (7) and spreader bar (8).
Raise front loader (TM 5-2420-224-10) to allow access to tow bar connection to wrecker.
8.
Attach tow bar (1) to wrecker.
9.
10. Move wrecker boom forward or backward to obtain proper boom-to-vehicle alinement.
11. Connect spreader bar (8) to wrecker boom. Raise front of vehicle until tires are 10-12 in.
(24.4-30.4 cm) off ground.
12. Place main shift lever in neutral, shift intermediate speed control in position H, Power Take-Off
in neutral, range-shift lever in stage II, and disengage four-wheel drive lever (TM 5-2420-224-10).
2-27
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |