Click here to make tpub.com your Home Page

Page Title: Crane Operation (HMMH). (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-10
(12) Main Mast Setup.
(a) Make sure extension boom is fully retracted by pushing down boom extension lever (5). Make sure outer
boom is fully retracted by pushing down outer boom control lever (6).
CAUTION
Failure to fully erect crane mast will cause damage to crane mast cylinders.
NOTE
Tilt lock lever and mast folding lever must be used together to move mast.
(b) Erect mast by pushing down tilt lock lever (9) and pulling up mast folding lever (1) at same time until mast
has stopped in upright position.
(c) Pull rotation lock lever (10) to detent position to release rotation lock.
(d) Raise inner boom to unfold crane by pulling up inner boom control lever (7).
(e) Raise outer boom to working position by pulling up outer boom control lever (6).
2-112

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business