|
|
TM 5-2420-224-10
(b)
Press clutch pedal, shift transmission into neutral, and pull PTO lever (12) to engage PTO.
CAUTION
When operating crane in soft areas, place load bearing pads under front and rear
stabilizers. Failure to do so could result in equipment damage.
(c) Lower both front stabilizers (13) to lowest position and install pins.
(d) Deploy both rear outrigger feet (14) from stowed position by removing quick-release pins (15) and unfolding
outrigger feet. Install quick-release pins (15).
2-109
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |