Click here to make tpub.com your Home Page

Page Title: Crane Operation (HMMH). (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2420-224-10
(b)
Press clutch pedal, shift transmission into neutral, and pull PTO lever (12) to engage PTO.
CAUTION
When operating crane in soft areas, place load bearing pads under front and rear
stabilizers. Failure to do so could result in equipment damage.
(c) Lower both front stabilizers (13) to lowest position and install pins.
(d) Deploy both rear outrigger feet (14) from stowed position by removing quick-release pins (15) and unfolding
outrigger feet. Install quick-release pins (15).
2-109

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business