| |
TM 5-2420-222-34
16-3
HYDRAULIC EARTH DRILL BORING HEAD REPAIR (Cont).
12.
Position shaft (10) with assembled parts in place in housing (7).
13.
Install proper quantity and size of new gaskets (9) on housing (7).
14.
Place cover (1) on housing (7). Install eight bolts (8) in cover and housing. Torque bolts to 50 lb.-ft. (68 Nm).
TA701667
16-15
|