| |
TM 5-2420-222-34
15-4.
BACKHOE MAIN FRAME MAINTENANCE (Cont).
6.
Install two pins (12) in main frame (1) and two towbars
(6).
7.
Install two screws (7) and nuts (8) in main frame (1)
and pins (12).
8.
Position two plates (2) in place on main frame (1) and
secure with four screws (3) and new lockwashers (4).
9.
Remove lifting device from main frame (1) and two
jackstands from under side frames (11).
FOLLOW-ON TASKS:
Install left and right fenders (see TM 5-2420-222-20).
Install left platform (see TM 5-2420-222-20).
Install right platform (see TM 5-2420-222-20).
Install rear tire and wheel assemblies (see TM 5-2420-222-20).
Install jaw control (direct linear) valve bracket (see TM 5-2420-222-20).
Install backhoe valve box (see TM 5-2420-222-20).
Install backhoe swing frame (see paragraph 15-3).
TA701650
15-21
|