| |
TM 5-2420-222-34
3-4.
ENGINE BLOCK MAINTENANCE.
This Task Covers:
a.
Disassembly
c.
Repair
b.
Cleaning and Inspection d.
d.
Assembly
Initial Setup:
Equipment Conditions:
Materials/Parts:
Engine oil (Item 25, Appendix B)
NOTE
Rags (Item 28, Appendix B)
Perform the following only on loader backhoes
Dry cleaning solvent (Item 31,
equipped with engine coolant heater.
Appendix B)
Nonelectrical wire (Item 44,
Appendix B)
One crankshaft
Engine coolant heater hoses and fittings removed
One rear bearing
(see TM5-2420-222-20).
Engine coolant heater removed (see TM5-2420-
222-20).
Tools/Test Equipment:
NOTE
General mechanic's tool kit
Perform the following on all loader backhoes.
Field automotive shop set
Engine assembly removed (see paragraph 3-3).
Personnel Required:
Two
Cylinder block plate removed (see paragraph 3-7).
Starter removed (see TM5-2420-222-20).
General Safety Instructions:
Lubricating cooler (engine oil cooler) removed (see
Dry cleaning solvent is flammable
TM 5-2420-222-20).
and must not be used near open
Flywheel housing removed (see paragraph 3-10).
flame. Use only in a well ventilated
Cylinder sleeves removed (see paragraph 3-5).
area.
Crankshaft removed (see paragraph 3-8).
Compressed air used for cleaning
Liquid level gage removed (see TM 5-2420-222-20).
purposes should never exceed 30
psi (207 kPa).
Avoid contact with live steam.
a.
DISASSEMBLY
1.
Remove four pipe plugs (14) from engine block (1).
NOTE
For loader backhoes equipped with engine coolant heater, skip step 2.
2.
Remove pipe plug (13) and draincock (12) from engine block (1).
CAUTION
Do not remove pins, Studs, plugs, or sleeve bushing In steps 3 through 7
unless damaged. Removal may damage parts.
3.
Remove two pins (2 and 3) from engine block (1).
4.
Remove two plugs (5) from engine block (1).
5.
Using gear and bearing mechanical puller, remove sleeve bushing (6) from engine block (1).
6.
Remove two pins (7) from engine block (1).
3-22
|