Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ASSEMBLY (cont)
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM5-2420-222-34 14-9. BACKHOE CONTROL VALVE ASSEMBLY REPAIR (Con’t). 12. Aline match-marks and install stabilizer valve (12) on boom valve (9). 13. Coat two new preformed packings (14) and new preformed packing (13) with hydraulic fluid and install in stabilizer valve (12). 14. Aline match-marks and install valve cap (15) on stabilizer valve (12). 15. Install five capscrews (16) and new lockwashers (17) in valve cap (15) and valve head (2).  Torque capscrews to 20-25 lb.-ft.  (28-34 N•m). FOLLOW-ON TASKS: Install backhoe control valve assembly (see TM 5-2420-222-20). TA701579 14-49

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business