| |
TM 5-2420-222-34
13-4.
ROLL-OVER PROTECTIVE STRUCTURE OR CANOPY REAR MOUNTS MAINTENANCE (Cont).
NOTE
Both warning light leads are Installed the same way. One side Is shown. Repeat
step 3 for other side.
3.
Attach routed lacing and tying tape to warning light lead (40). Pull lacing and tying tape with attached warning light
lead through canopy or ROPS (7) until lead is visible at both ends. Remove lacing and tying tape.
4.
Install four grommets (39) in canopy or ROPS (7).
5.
Install canopy protective roof (see paragraph 13-2 or 13-3).
TA701520
13-20
|