Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION (cont)
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM5-2420-222-34 13-1. ROLL-OVER PROTECTIVE STRUCTURE OR CANOPY FRONT MOUNTS AND BRACKETS MAINTENANCE (Con’t). NOTE If Installing right special bracket and front mounts, skip step 6. 6. Install screw (1), two  clamps  (12),  spacer  (11),  new  lockwasher  (10),  and  nut  (9)  on  two  hydraulic  lines  (2)  and special bracket weldment (8). 7. Position front crossmember (3) in place on canopy or ROPS (4) and secure with four screws (7), washers (6), and new lockwashers (5). 8. Remove lifting device from canopy of ROPS (4). FOLLOW-ON TASKS: NOTE Perform the following only if left front mounts were removed. Install left platform (see TM 5-2420-222-20). NOTE Perform the following only if right front mounts were removed. Install accumulator (see TM 5-2420-222-20). Install right platform (see TM 5-2420-222-20). NOTE Perform the following if right and left front mounts were removed . Install left outer platform (see TM 5-2420-222-20). Install right inner platform (see TM 5-2420-222-20). 13-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business