| |
TM 5-2420-222-34
10-2.
PARKING BRAKE LINKAGE MAINTENANCE.
This Task Covers:
a.
Removal
d.
Repair
b.
Disassembly
e.
Assembly
c.
Cleaning and Inspection
f.
Installation
Initial Setup:
Equipment Conditions:
Materials/Parts:
Parking brake band and lining removed (see para-
Rags (Item 28, Appendix B)
graph 10-1).
Dry cleaning solvent (Item 31, Appendix B)
One preformed packing
Tools/Test Equipment:
One washer
Two spring pins
General mechanic's tool kit
Four cotter pins
Field automotive shop set
General Safety Instructions:
Dry cleaning solvent Is flammable and must not be used near open flame. Use only in a well-ventilated area.
a.
REMOVAL
NOTE
If brake shouldered shaft does not have to be removed, skip steps 1 through 9.
1.
Remove backhoe main frame (see paragraph 15-4).
NOTE
Loader backhoes with serial numbers 235786-235999 have a canopy. Loader
backhoes with serial numbers 319995-342573 have a roll-over protective structure
(ROPS).
2.
Remove roll-over protective structure or canopy right rear support and mounts (see paragraph 13-4).
3.
Remove cotter pin (1) and straight pin (3) from brake rod (2) and support arm (4). Discard cotter pin.
NOTE
Use a drain pan to catch fluid when disconnecting hose. Clean up all spills.
4.
Remove elbow (8) and hose (7) from tee (9).
5.
Drive spring pin (5) out of shouldered shaft (6). Discard spring pin.
10-6
|