Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: REMOVAL
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-34 10-1. PARKING BRAKE BAND AND LINING MAINTENANCE (Con’t). a. REMOVAL WARNING Ensure that loader bucket and backhoe bucket are lowered to ground and wheels are    blocked    to    prevent    loader    backhoe     from     moving     while     performing maintenance on parking brake. 1. Release parking brake lever (see TM 5-2420-222-10). 2. Disconnect auger bleed line (6) from elbow (5).  Remove elbow and adapter (7) from transmission (9). 3. Remove special capscrew (8) from brake band and lining (1) and shouldered pin (12). 4. Loosen nut (14) and remove special screw (16) and preformed packing (15) from transmission (9).  Discard preformed packing.  Remove nut from special screw. 5. Remove cotter pin (19), straight pin (10), and washer (13) from anchor band (11) and brake band and lining (1). Discard cotter pin. 6. Remove spring (2) from grooved pin (4) and spring pin (3). 7. Spread and rotate brake band and lining (1) out of parking brake drum (17) and anchor band (11). b. DISASSEMBLY CAUTION Do    not    remove    linings    from    brake    band unless    damaged.        Removal    will    damage parts. Using  electric  drill  and  twist  drill  set,  remove  12 rivets (21) and four linings (22) from brake band (20). TA701457 10-2

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business