Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-34 8-21. REVERSER OIL LINES REPLACEMENT (Con’t). b. INSTALLATION 1. If removed, install two studs (17). 2. Install bracket (16) with two lockplates (15) and nuts (14). 3. Install two new preformed packings (18) and sleeve nuts (19) in transmission oil pump (23). 4. Install transmission oil pump inlet tube (22) and outlet tube (21) in transmission oil pump inlet and outlet with four new preformed packings (20). 5. Install rear clutch lubrication tube (12) in retaining plate (10) with two new preformed packings (11). 6. Install filter tube (6) in retaining plate (10) with two new preformed packings (7). 7. Install transmission lubrication tube (8) in retaining plate (10) and transmission with two new preformed packings (9). 8. Install  reverse  clutch  pressure  tube  (13)  in  retaining  plate  (10)  and  reverse  clutch  with  two  new  preformed packings (5). 9. Install lubrication tube (2) in front clutch with new preformed packing (1). 10. Install front clutch pressure tube (4) on lubrication tube (2) using new preformed packings (1 and 3). 11. Install other end of front clutch pressure tube (4) in retaining plate (10) with new preformed packing (3). FOLLOW-ON TASKS: Install reverser housing (see paragraph 8-16). 8-103

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business