Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION II. MAINTENANCE ALLOCATION CHART CONT.
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-3 (1) (2) (3) (4) (5) (6) Maintenance Level Group Maintenance UNIT DS GS DEPOT Tools and Number Component/Assembly Function C O F H D Equipment Remarks 0613 Hull or Chassis Wiring Harness (Con’t) Main Wiring Harness Replace 2.5 3 07 TRANSMISSION 0700 Transmission Assembly Hydraulic Transmission Inspect 0.5 Test 1.0 3,5,15 Service 0.5 1.0 1-3 Replace 20.0 3-15 Repair 17.5 3,8,15 Case Replace 15.5 3,15 Repair 8.0 3,15 Transmission Case Cover Replace 1.5 3,15 0701 Transmission Shafts Countershaft Replace 10.5 3,15 Repair 5.0 3,15 Transmission Drive Shaft Replace 10.5 3,15 Repair 5.0 3,15 0702 Opposed Output Differential Drive Shaft, Replace 13.5 3,15 Gears, and Bearings Repair 1.0 3,15 Differential Gear and Replace 10.3 3,15 Pinion Repair 1.0 3,15 Lock Assembly Repair 10.3 3,15 0704 Transmission Top Cover Assembly Gear Shifters and Shifter Repair 10.9 3,15 Shafts Speed Gear Assembly Replace 2.0 3 (Reverser) Top Cover Transmission Top Cover Replace 2.0 3,15 Repair 2.0 3,15 Transmission Dipstick Replace 0.2 Change 1  B-12

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business