Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: HYDRAULIC EARTH DRILL AUGER - CONTINUED
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-3 HYDRAULIC EARTH DRILL AUGER - CONTINUED ACTION LOCATION ITEM REMARKS CLEANING - CONTINUED 5. All other parts a. Clean in drycleaning solvent. b. Using clean, dry rags, wipe dry. INSPECTION/REPLACEMENT NOTE For   more   information   on   how   to   inspect   parts,   go   to   General   Maintenance Instructions (page 2-137). Replace defective parts as needed. 6. All threaded parts Look for damaged threads. 7. All metal parts Look for cracks, breaks, and abnormal bends. INSTALLATION 8. Boring head (1) Earth Auger (2) With aid of assistant, place in position. 9. Boring head (1) Shear bolt (3) and a. Have assistant aline pin holes in and earth auger (2) nut (4) auger (2) and head (1). b. Screw together and tighten using 3/4-inch drive socket, and ratchet handle. 10. Boring head (1) Setscrew (5) Screw in and tighten using 3/4-inch, and earth auger (2) 3/8-inch drive socket and ratchet handle. 2-1868

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business