| |
TM 5-2420-222-20-3
LOADER BUCKET LINKAGE -CONTINUED
ACTION
LOCATION
ITEM
REMARKS
REMOVAL - CONTINUED
4.
Two front guide
Pin (7)
Using 3-pound head cross-peen hammer
links (1 and 2),
and 3/4-inch brass-tipped driftpin,
bucket link (3),
drive out.
indicator pivot (4)
or washer (5), and
loader bucket
cylinder piston
rod (6)
5.
Loader bucket
Two front guide
Take off.
cylinder piston
links (1 and 2),
rod (6)
indicator pivot (4)
or washer (5), and
bucket link (3)
6.
Bucket link (3)
Pin (9)
Using 3-pound head cross-peen hammer
and loader
and 3/4-inch brass-tipped driftpin, drive
bucket (8)
out.
7.
Loader bucket (8)
Bucket link (3)
Take out.
8.
Two front guide
Pin (11)
Using 3-pound head cross-peen hammer
links (1 and 2)
and 3/4-inch brass-tipped driftpin, drive
and lift arms (10)
out.
9.
Lift arms (10)
Two front guide
Take off.
links (1 and 2)
DISASSEMBLY
CAUTION
Do not remove bushings unless inspection shows need for replacement. Removal
may damage parts.
10.
Bucket link (3)
Three bushings
Using arbor press and 2-inch remover and
(12, 13, and 14)
installer, press out.
11.
Grease fitting (15)
Using 7/16-inch, 1/4-inch drive socket
and ratchet handle, unscrew and take out.
2-1846
|