| |
TM 5-2420-222-20-3
BACKHOE BUCKET - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
79.
Pin (1) and
Ring (2)
On loader backhoes equipped with retaining
inner bucket (5)
rings, using retaining ring pliers, put on.
TASK ENDS HERE
BACKHOE BUCKET TEETH
This task covers:
a.
Removal (page 2-1816)
c.
Inspection/Replacement (page 2-1816)
b.
Cleaning (page 2-1816)
d.
Installation (page 2-1817)
INITIAL SETUP
Tools
Materials/Parts - Continued
Block, wood
Rags, wiping (item 21, Appendix C)
Driftpin, brass-tipped, 3/4-inch
Solvent, drycleaning (item 28, Appendix C)
Hammer, cross-peen, 3-pound head
Punch, drive-pin, straight, 1/4-inch
Personnel Required
Materials/Parts
One
Detergent, GP (item 7, Appendix C)
TA243605
2-1815
|