TM 5-2420-222-20-3
LOADER BUCKET CYLINDERS
This task covers:
a. Removal (page 2-1760)
d.
Inspection/Replacement (page 2-1765)
b. Disassembly (page 2-1763)
e.
Assembly (page 2-1765)
c. Cleaning (page 2-1764)
f.
Installation (page 2-1766)
INITIAL SETUP
Tools
Materials/Parts
Driftpin, brass-tipped, 3/4-inch
Packing, adapter-to-cylinder
Hammer, cross-peen, 3-pound head
(two required)
Knife, pocket
Rags, wiping (item 21, Appendix C)
Lifting equipment, 200-pound capacity
Solvent, drycleaning (item 28, Appendix C)
Pan, drain
Tags, marking (item 30, Appendix C)
Pliers, retaining ring
Pliers, snapring
Personnel Required
Screwdriver, flat-tip, 1/4-inch
Wrench, open-end, 7/16-inch
One
Wrench, open-end, 7/8-inch
Wrench, open-end, 1-inch
Equipment Condition
NOTE
Hydraulic system pressure released
(page 2-1191)
The following tools only apply
to right-hand loader bucket
cylinders.
Handle, ratchet, 3/8-inch drive
Socket, 3/8-inch drive, 9/16-inch
ACTION
LOCATION
ITEM
REMARKS
NOTE
Both loader bucket cylinders are maintained the same way except as noted. Right
side is shown. Repeat procedures for left side as needed.
REMOVAL
1.
Loader bucket
Two clamps (4)
a.
Note positions for proper placement
cylinder (1) and
during installation.
two lines (2 and 3)
b.
Using 1/4-inch flat-tip screwdriver,
loosen and take off.
2-1760
|