| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE-TO-LOADER BOOM CYLINDER HEAD END OIL LINES
This task covers:
a
Removal (page 2-1680)
c Inspection/Replacement (page 2-1684)
b
Cleaning (page 2-1682)
d Installation (page 2-1684)
INITIAL SETUP
Tools
Materials/Parts - Continued
Handle, ratchet, 318-inch drive
Rags, wiping (item 21, Appendix C)
Knife, pocket
Solvent, drycleaning (item 28, Appendix C)
Pan, drain
Tags, marking (item 30, Appendix C)
Screwdriver, flat-tip, 1/4-inch
Socket, 3/8-inch drive, 9/16-inch
Personnel Required
Wrench, open-end, 7/8-inch
Wrench, open-end, 1-inch
One
(two required)
Equipment Condition
Materials/Parts
1 Hydraulic pressure released
Detergent, GP (item 7, Appendix C)
(page 2-1191)
Lockwasher, clamp
2 Right platform removed (page 2-1079)
Packing, long tee
Packing, union
ACTION
LOCATION
ITEM
REMARKS
NOTE
Both loader control valve-to-loader boom cylinder oil lines are maintained the same way except as
noted. Left oil line is shown. Repeat procedures as needed for right oil line.
2-1679
|