| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE-TO-LOADER BUCKET CYLINDER ROD END OIL LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
REMOVAL - CONTINUED
NOTE
If removing loader control valve-to-right loader bucket cylinder oil line, skip steps 6 thru 8.
6.
Left side frame
Four hoses (7, 8,
Tag (page 2-137).
(4), clamp (5),
9, and 10)
and spacer (6)
7.
Screw (11) and
a.
Using 9/16-inch, 3/8-inch drive
lockwasher (12)
socket and ratchet handle, unscrew
and take out.
b.
Get rid of lockwasher (12).
8.
Left side
Clamp (5), spacer
a.
Note relative position of hoses (7,
frame (4)
(6), and four hoses
8, 9, and 10) for placement during
(7, 8, 9, and 10)
installation.
b.
Take off.
9.
Tee (13)
Two hoses
a.
Place drain pan underneath.
(7 and 14)
b.
Using 7/8-inch and 1-inch open-end
wrenches, unscrew and take out.
c.
Cap hose (7 or 14) (page 2-137) if
removed for access.
d.
Tag (page 2-137).
10
Elbow (15)
Oil line (16)
Using 1-inch and 1 1/16-inch open-end
wrenches, loosen.
11
Special
Oil line (18)
a
Place drain pan underneath.
connector (17)
b
Using 1-inch and 1 1/4-inch open-end
wrenches, unscrew and take out.
c
Plug (page 2-137).
d
Cap connector (1) (page 2-137).
e
Tag (page 2-137).
12
Loader control
Nut (20)
Using two 1-inch open-end wrenches,
valve (19) and
loosen.
tee (13)
13
Loader bucket
Tee (13) with
a.
Note relative position for proper
valve (19)
assembled parts
placement during installation.
b
Using 1-inch open-end wrench,
unscrew and take out.
c.
Plug valve (3) (page 2-137).
d.
Get rid of drained fluid (page 2-137).
2-1672
|