| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE-TO-LOADER BUCKET CYLINDER HEAD END OIL LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
REMOVAL - CONTINUED
10
Tee (1)
Hose (2)
a
Using 7/8-inch and 1-inch open-end
wrenches, unscrew and take out.
b
Cap (page 2-137).
c
Tag (page 2-137).
d
Plug tee (1) (page 2-137).
11
Long tee (3)
Two hoses
a
Using 7/8-inch and 1-inch open-end
(4 and 5)
wrenches, unscrew and take out.
b
Cap hose (4 or 5) (page 2-137) if
removed for access.
c
Tag (page 2-137).
12
Loader control
Nut (7)
Using two 1-inch open-end wrenches,
valve (6) and
loosen.
long tee (3)
13
Loader control
Long tee (3) with
a
Note relative position for proper
valve (6)
assembled parts
placement during installation.
b
Using 1-inch open-end wrench,
unscrew and take out.
c
Plug valve (6) (page 2-137).
d
Get rid of drained fluid (page 2-137).
14
Long tee (3)
Packing (8)
a
Using pocket knife, take off.
b
Get rid of.
CLEANING
NOTE
For more information on how to clean parts, go to General Maintenance Instructions (page 2-137).
15
Hose (4 or 5)
a
Using clean rags dampened in solution
of detergent and water, wipe clean.
b
Rinse with clean water.
c
Using clean, dry rags, wipe dry.
2-1664
|