| |
TM 5-2420-222-20-3
PRESSURE CONTROL VALVE-TO-LOADER CONTROL VALVE OIL LINE
This task covers:
a.
Removal (page 2-1648)
c.
Inspection/Replacement (page 2-1650)
b.
Cleaning (page 2-1648)
d.
Installation (page 2-1650)
INITIAL SETUP
Tools
Personnel Required
Knife, pocket
One
Pan, drain
Wrench, open-end, 7/8-inch
Equipment Condition
Wrench, open-end, 1 11/16-inch
Wrench, open-end, 1 1/4-inch
1.
Right platform removed (page 2-1079)
2.
Transmission oil filter removed
Materials/Parts
(page 2-836)
Packing, elbow
Packing, special connector
Rags, wiping (item 21, Appendix C)
Solvent, drycleaning (item 28,
Appendix C)
Tags, marking (item 30, Appendix C)
2-1647
|