TM 5-2420-222-20-3
BACKHOE CONTROL VALVE-TO-BACKHOE STABILIZER CYLINDER OIL LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
NOTE
If only installing backhoe control valve-to-head end stabilizer cylinder oil lines, skip
steps 50 thru 54.
50.
Hose (10)
Clamp (11)
Place in position.
51.
Clamp (11) and main
Screw (13), new
Screw together and tighten using 9/16-
frame (12)
lockwasher (14),
inch open-end wrench, and 9/16-inch,
washer (15), and
3/8-inch drive socket and ratchet
nut (16)
handle.
52.
Adapter (17)
New packing (18)
Place in position.
53.
Stabilizer
Adapter (17)
a.
Unplug cylinder(10).
cylinder (19)
with assembled
b.
Screw in and tighten using 7/8-inch
packing (18)
open-end wrench.
54.
Adapter (17)
Hose (10)
Screw in and tighten using 11/16-inch and
7/8-inch open-end wrenches.
2-1633
|