| |
TM 5-2420-222-20-3
JAW CONTROL (DIRECT LINEAR) VALVE-TO-MANIFOLD BLOCK OIL LINES - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
24.
Tube (1)
Hose (2)
a.
Uncap tube (1).
b.
Screw on and tighten using 3/4-inch
and 7/8 inch open-end wrenches.
c.
Take off tag.
25.
Two tubes (1 and
Two clamps (5 and 6)
Place in position.
3 and clamp (4)
and spacer (7)
26.
Three clamps (4
Screw (9) and new
Screw in and tighten using 9/16-inch,
thru 6), spacer (7)
lockwasher (10)
3/8-inch drive socket and ratchet
and boom (8)
handle.
27.
Nine hoses (2 and
New band (19)
a.
Place in position.
11 thru 18)
b.
Using slip-joint pliers, tighten until
snug.
NOTE
New isolators are manufactured from bulk items. For more information on manufacturing new
isolators, refer to Appendix D).
28.
Hose (2)
Isolator (20)
Place in position.
29.
Bracket (21)
Hose (2) with
Place in position.
assembled
isolator (20)
30.
Bracket (21), two
Clamp (22)
Place in position.
hoses (11 and 12),
and isolator (20)
31.
Bracket (21) and
Screw (23) and new
Screw together and tighten using 9/16-
clamp (22)
special nut (24)
inch, 3/8-inch drive socket, ratchet
handle, and 9/16-inch box wrench.
32.
Elbow (25)
Nut (26)
Screw on all the way.
33.
New packing (27)
Place in position.
34.
Valve (28)
Elbow (25) with
a.
Unplug valve (28).
assembled parts
b.
Screw in to same relative position
noted during removal using 13/16-
inch open-end wrench.
2-1518
|