| |
TM 5-2420-222-20-3
HYDRAULIC OIL COOLER-TO-CLUTCH CONTROL VALVE OIL LINE
This task covers:
a. Removal (page 2-1362)
d. Inspection/Replacement (page 2-1365)
b. Disassembly (page 2-1364)
e. Assembly (page 2-1365)
c. Cleaning (page 2-1364)
f. Installation (page 2-1366)
INITIAL SETUP
Tools
Materials/Parts
Extension, 1/2-inch drive, 5-inch
Detergent, GP (item 7, Appendix C)
Handle, ratchet, 1/2-inch drive
Lockwasher, bracket screw, (two required)
Pan, drain
Lockwasher, clamp screw (two required)
Screwdriver, flat-tip, 1/4-inch
Packing, clutch control valve-to-oil line
Socket, 1/2-inch drive, 7/16-inch
Rags, wiping (item 21, Appendix C)
Socket, 1/2-inch drive, 1/2-inch
Solvent, drycleaning (item 28, Appendix C)
Socket, 1/2-inch drive, 9/16-inch
Tags, marking (item 30, Appendix C)
Wrench, box, 9/16-inch
Wrench, open-end, 7/16-inch
Personnel Required
Wrench, open-end, 1/2-inch
Wrench, torque, 1/2-inch drive,
One
0 to 150 foot-pound capacity
Equipment Condition
1.
Hydraulic system pressure released
(page 2-1191)
2.
Right side grille removed
(TM 5-2420-222-10)
2-1361
|