| |
TM 5-2420-222-20-3
JAW CONTROL (DIRECT LINEAR) VALVE BRACKET - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSPECTION/REPLACEMENT
NOTE
For more information on how to inspect parts, go to General Maintenance Instructions
(page 2-137).
Replace defective parts which cannot be repaired.
5.
All metal parts
Look for cracks, bends, and breaks.
6.
All threaded parts
Look for damaged threads.
REPAIR
7.
Bracket (1)
If threads are damaged, using screw threading set,
restore threads.
INSTALLATION
8. Bracket (1)
Screw (2)
Place in position.
9. Main frame (3)
Bracket (1) with
Place in position.
assembled screw (2)
10. Bracket (1) and
Two screws (4) and
Screw in and tighten using 9/16-inch,
main frame (3)
new lockwasher (5)
1/2-inch drive socket and ratchet handle.
11. Loader backhoe
Jaw control
Install (page 2-1294).
(direct linear)
Do not install rear platform or
valve linkage
right rear platform at this time.
12.
Jaw control
On loader backhoes with Serial Numbers
valve
235786 thru 235999, install (page 2-1242).
13.
Jaw direct linear
On loader backhoes with Serial Numbers
valve
319995 thru 342573, install (page 2-1250).
2-1300
|