| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
34. Special
Oil line (2)
a.
Take off tag.
connector (1)
b.
Unplug.
c.
Screw on and tighten using 1 1/4-
inch open-end wrench.
35. Tee (3)
Two hoses
a.
Take off tags.
(4 and 5)
b.
Uncap.
c.
Screw on and tighten using 7/8-inch
and 1-inch open-end wrenches.
36. Long tee (6)
Two hoses
a.
Take off tags.
(7 and 8)
b.
Uncap.
c.
Screw on and tighten using 7/8-inch
and 1-inch open-end wrenches.
37. Loader control
Loader control valve
Install (page 2-1324).
valve
handle and linkage
Do not install right platform at this time.
38. Loader backhoe
Transmission
Check fluid level and add proper amount
and grade (TM 5-2420-222-10).
39.
Engine
Start and run at high idle
(TM 5-2420-222-10).
40.
Loader control
a.
Operate loader bucket
valve
(TM 5-2420-222-10) and check for leaks.
b.
If leaking at any connection, tighten
using 7/8-inch, two 1 1/4-inch, and
two 1-inch open-end wrenches.
c.
If leaking does not stop, shut down
engine (TM 5-2420-222-10) and
replace defective packing or component
as outlined in this task.
d.
If leaks were found, repeat steps 38
thru 40.
41.
Engine
If still running, shut down
(TM 5-2420-222-10).
2-1292
|