| |
TM 5-2420-222-20-3
LOADER CONTROL VALVE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
ASSEMBLY
20. Two long tees
Four nuts
Screw on all the way.
(1 and 2) and two
(5 thru 8)
tees (3 and 4)
21.
Four new
Place in position.
packings (9 thru 12)
22. Valve (13)
Two long tees
a.
Place valve in machinists vise.
(1 and 2), two
b.
Screw in and tighten to position noted
tees (3 and 4) with
during disassembly using 1-inch
assembled parts
open-end wrench.
23. Two long tees
Four nuts
Using two 1-inch open-end wrenches,
(1 and 2), two
(5 thru 8)
tighten until seated against valve (13).
tees (3 and 4),
and valve (13)
24. Special
New packing (15)
Place in position.
connector (14)
25. Valve (13)
Special connector
Screw in and tighten using 1 1/4-inch
(14) with assembled
open-end wrench.
packing (15)
26. Connector(16)
New packing (17)
Place in position.
27. Valve (13)
Connector (16)
a.
Screw in and tighten using 1 1/4-inch
with assembled
open-end wrench.
packing (17)
b.
Take valve (13) out of machinists vise.
INSTALLATION
28. Bracket (18)
Valve (13) with
Have assistant place in position.
assembled parts
29. Bracket (18) and
Three screws (19)
a.
Have assistant support valve (13).
valve (13)
and new lock-
b.
Screw in and tighten using 3/4-inch,
washers (20)
1/2-inch drive socket and ratchet handle.
30. Connector(16)
Oil line (21)
a.
Take off tag.
b.
Unplug.
c.
Screw on and tighten using 1 1/4-inch open-end
wrench.
2-1290
|