TM 5-2420-222-20-3
LOADER CONTROL VALVE MOUNTING BRACKET
This task covers:
a.
Removal (page 2-1282)
c.
Inspection/Replacement (page 2-1283)
b.
Cleaning (page 2-1282)
d.
Installation (page 2-1284)
INITIAL SETUP
Tools
Personnel Required
Handle, ratchet, 1/2-inch drive
One
Socket, 1/2-inch drive, 3/4-inch
Wrench, torque, 1/2-inch drive,
Equipment Condition
0 to 150 foot-pound capacity
Loader control valve removed (page 2-1285)
Materials/Parts
Lockwasher, bracket screw
(two required)
Rags, wiping (item 21, Appendix C)
Solvent, drycleaning
(item 28, Appendix C)
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1. Bracket (1), rear
Two screws (4) and
a.
Using 3/4-inch, 1/2-inch drive socket
axle housing (2)
lockwashers (5)
and ratchet handle, unscrew and take
and transmission
out.
case (3)
b.
Get rid of lockwashers (5).
2. Rear axle
Bracket (1)
Take off.
housing (2)
CLEANING
NOTE
For more information on how to clean parts, go to General Maintenance Instructions
(page 2-137).
2-1282
|