| |
TM 5-2420-222-20-2
LOADER CONTROL BOX - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
39. Control box (1)
Control pivot (2)
Move into position.
with assembled parts
40. Control box (1) and
Two new lockwashers
a.
Screw in part way.
control pivot (2)
(3) and screws (4)
b.
Using 9/16-inch box wrench, tighten.
41. Handle mount (5)
Handle (6)
Screw into position as noted during
removal.
42. Handle (6) and
Nut (7)
While holding handle (6) in position, using
handle mount (5)
15/16-inch open-end wrench, tighten.
NOTE
FOLLOW-ON MAINTENANCE:
1.
Install loader control box door (page 2-1167).
2.
Install battery ground cable (page 2-696).
TASK ENDS HERE
2-1178
|