| |
TM 5-2420-222-20-2
SEAT BELT
This task covers:
a.
Removal (page 2-1150)
d.
Inspection/Replacement (page 2-1152)
b.
Disassembly (page 2-1150)
e.
Assembly (page 2-1152)
c.
Cleaning (page 2-1150)
f.
Installation (page 2-1152)
INITIAL SETUP:
Tools
Materials/Parts - Continued
Handle, ratchet, 1/2-inch drive
Lockwasher, seat belt screw
Socket, 1/2-inch drive, 3/4-inch
(two required)
Socket, 1/2-inch drive, 7/8-inch
Rags, wiping (item 21, Appendix C)
Wrench, open-end, 11/16-inch
Solvent, drycleaning (item 28, Appendix C)
Wrench, open-end, 3/4-inch
Personnel Required
Materials/Parts
One
Detergent, GP (item 7, Appendix C)
Lockwasher, seat belt bracket screw and
nut (four required)
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1. Seat frame (1)
Two screws (3),
a.
Using 3/4-inch, 1/2-inch drive socket
and two seat belt
lockwashers (4),
and ratchet handle, and 3/4-inch
brackets (2)
and nuts (5)
open-end wrench, unscrew and take
apart.
b.
Get rid of lockwashers (4).
2. Seat frame (1)
Two seat belt
Take off.
brackets (2) with
attached seat belt (6)
DISASSEMBLY
3. Seat belt (6) and
Two screws (7), four
a.
Using 7/8-inch, 1/2-inch drive socket
two seat belt
washers (8), two
and ratchet handle, and 11/16-inch
brackets (2)
lockwashers (9), and
open-end wrench, unscrew and take
two nuts (10)
apart.
b.
Get rid of lockwashers (9).
4.
Seat belt (6)
Two seat belt
Take off.
brackets (2)
2-1150
|