Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSPECTION/REPLACEMENT - CONTINUED
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-2 CENTER PLATFORM - CONTINUED ACTION LOCATION ITEM REMARKS INSPECTION/REPLACEMENT - CONTINUED 12. Center platform (1) Look for cracks, breaks, and abnormal bends. 13. All attaching Look for damaged threads. hardware 14. Pad (2), if present Look for cracks, tears, and crumbling. ASSEMBLY NOTE Step 15 only applies to loader backhoes with Serial Numbers 319995 thru 342573. 15. Center platform (1) Pad (2) a. If removed, apply metal adhesive in 0.06 to 0.18-inch (1.52 to 4.57 mm) wide beads, in 2.00-inch (50.8 mm) or smaller squares. Make sure that outside bead is within 0.25-inch (6.35 mm) of edge with no gaps. b. Line up and press into place to transfer some metal adhesive. c. Take off and allow metal adhesive to set for two minutes. d. Line up and press firmly into place. INSTALLATION 16. Filler tube (3) Dipstick (4) a. Loosen. b. Pull out. 17. Center platform Center platform (1) a. Guide gear shift levers (8) through support (5), rear holes. cross member (6), b. Guide differential lock rod (9) through and two gear shift hole. lever boots (7) c. Pushing boots (7) through holes, place in position. 18. Filler tube (3) Dipstick (4) a. Place in position. b. Tighten. 2-1104

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business