| |
TM 5-2420-222-20-2
CENTER PLATFORM - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSPECTION/REPLACEMENT - CONTINUED
12.
Center platform (1)
Look for cracks, breaks, and abnormal
bends.
13.
All attaching
Look for damaged threads.
hardware
14.
Pad (2), if present
Look for cracks, tears, and crumbling.
ASSEMBLY
NOTE
Step 15 only applies to loader backhoes with Serial Numbers 319995 thru 342573.
15.
Center platform (1)
Pad (2)
a.
If removed, apply metal adhesive in
0.06 to 0.18-inch (1.52 to 4.57 mm)
wide beads, in 2.00-inch (50.8 mm) or
smaller squares.
Make sure that outside bead is within
0.25-inch (6.35 mm) of edge with no
gaps.
b.
Line up and press into place to transfer
some metal adhesive.
c.
Take off and allow metal adhesive to set
for two minutes.
d.
Line up and press firmly into place.
INSTALLATION
16.
Filler tube (3)
Dipstick (4)
a.
Loosen.
b.
Pull out.
17.
Center platform
Center platform (1)
a.
Guide gear shift levers (8) through
support (5), rear
holes.
cross member (6),
b.
Guide differential lock rod (9) through
and two gear shift
hole.
lever boots (7)
c.
Pushing boots (7) through holes, place
in position.
18.
Filler tube (3)
Dipstick (4)
a.
Place in position.
b.
Tighten.
2-1104
|