| |
TM 5-2420-222-20-2
LEFT OUTER PLATFORM RAMP - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
13. Ramp (1) and center
New lockwasher (3)
Screw in part way.
platform support (2)
and screw (4)
14. Ramp (1) and front
Washer (6), new
Screw in and tighten using 9/16-inch,
cross member (5)
lockwasher (7),
3/8-inch drive socket and ratchet handle.
and screw (8)
15. Ramp (1) and center
Screw (4)
Using 9/16-inch, 3/8-inch drive socket
platform support (2)
and ratchet handle, tighten.
NOTE
FOLLOW-ON MAINTENANCE: Install left inner platform ramp (page 2-1066).
TASK ENDS HERE
2-1078
|