| |
TM 5-2420-222-20-2
STABILIZERS
This task covers:
a.
Removal
e.
Repair (page 2-1054)
b.
Disassembly (page 2-1052)
f.
Assembly (page 2-1055)
c.
Cleaning (page 2-1054)
g.
Installation (page 2-1056)
d.
Inspection/Replacement (page 2-1054)
INITIAL SETUP:
Tools
Materials/Parts - Continued
Bar, pinch, 26-inch
Rags, wiping (item 21, Appendix C)
Blocks, wood
Solvent, drycleaning (item 28, Appendix C)
Chisel, cold, 1/2-inch
Driftpin, brass-tipped, 3/4-inch
Personnel Required
Hammer, ball-peen, 2-pound head
Hammer, cross-peen, 3-pound head Two
Handle, ratchet, 1/2-inch drive
Jack, dolly-type, hydraulic, 10-ton
Equipment Condition
capacity
Pliers, slip-joint, mutiple tongue
NOTE
and groove
Socket, 1/2-inch drive, 3/4-inch
The following applies only at location
Wrench, open-end, 11/16-inch
where maintenance is to be performed.
Wrench, open-end, 3/4-inch
Wrench, open-end, 7/8-inch
1.
Stabilizers lowered (TM 5-2420-222-10)
2.
Hydraulic system pressure released
Materials/Parts
(page 2-1191).
Locknut, stabilizer cylinder rod end
Pin, cotter, main frame stabilizer
(two required)
Pin, cotter, stabilizer foot
(two required)
ACTION
LOCATION
ITEM
REMARKS
NOTE
Both stabilizers are maintained the same way. Right stabilizer is shown. Repeat
procedures for left stabilizer as needed.
2-1049
|