| |
TM 5-2420-222-20-2
COWL FRONT COVER
This task covers:
a.
Removal (page 2-1020)
d.
Inspection/Replacement (page 2-1023)
b. Disassembly (page 2-1020)
e.
Assembly (page 2-1023)
c.
Cleaning (page 2-1022)
f.
Installation (page 2-1024)
INITIAL SETUP:
Tools
Materials/Parts - Continued
Handle, ratchet, 3/8-inch drive
Solvent, drycleaning (item 28, Appendix C)
Knife, putty
Rags, wiping (item 30, Appendix C)
Socket, 318-inch drive, 7/16-inch
Personnel Required
Materials/Parts
One
Adhesive, metal bonding
(item 1, Appendix C)
Equipment Condition
Detergent, GP (item 7, Appendix C)
Lockwasher, cowl support screw
Hood removed (page 2-1025)
(six required)
Solvent, cleaning compound (item 27,
Appendix C)
ACTION
LOCATION
ITEM
REMARKS
REMOVAL
1.
Cowl front cover (1)
Six screws (3) and a.
Using 7/16-inch, 3/8-inch drive socket
and cowl support (2)
lockwashers (4)
and ratchet handle, unscrew and take
out.
b.
Get rid of lockwashers (4).
2.
Cowl support (2) and
Cowl front cover (1)
Take off.
capillary tube
with assembled cowl
grommet (5)
barrier (6), if
present
DISASSEMBLY
NOTE
Step 3 only applies to loader backhoes with Serial Numbers 319995 thru 342573.
2-1020
|