Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-2 STEERING VALVE-TO-TRANSMISSION RETURN OIL LINE - CONTINUED ACTION LOCATION ITEM REMARKS INSTALLATION - CONTINUED 28.  Loader backhoe Batteries Install (page 2-692). 29. Battery ground Install (page 2-696). cable 30. Transmission Fill (page 2-811). 31. Engine Start and run at high idle (TM 5-2420-222-10). 32. Steering valve-to- a.  Check for leaks. transmission b.  If leaking at any connection, tighten return oil line using 5/8-inch and/or 11/16-inch and/or 7/8-inch open-end wrenches, or 1 1/8-inch combination box and open-end wrench. c.  If leaking does not stop, shut down engine (TM 5-2420-222-10) and replace leaking connection packing or line as outlined in this task. d.  If leak was found, repeat step 30. 33. Engine If still running, shut down (TM 5-2420-222-10). NOTE FOLLOW-ON MAINTENANCE: 1.  Install right inner platform ramp (page 2-1095). 2.  Install left outer platform ramp (page 2-1073). 3.  Install cowl front cover (page 2-1020). TASK ENDS HERE 2-992