| |
TM 5-2420-222-20-2
ACCUMULATOR TEE-TO-STEERING VALVE OIL LINE - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
18. Elbow (6)
New packing (7)
Place in position.
19.
Nut (8)
Screw on all the way.
20. Check valve (3)
Elbow (6) with
Screw in and tighten to same position as
assembled parts
noted during removal using open-end
wrench.
21. Elbow (6) and
Nut (8)
Using open-end wrench, tighten until
check valve (3)
seated against check valve (3).
22. Elbow (6)
Hose (1)
a. Takeoff tag.
b. Screw on and tighten using xx-inch
open-end wrench.
NOTE
Steps 23 thru 26 only apply to loader backhoes with Serial Numbers 319995 thru 342573.
23. Check valve (9)
New packing (10)
Place in position.
24. Steering valve (5)
Check valve (9)
a. Uncap steering valve (5).
with assembled
b. Screw in and tighten using 7/8-inch,
packing (10)
1/2-inch drive socket, 5-inch
extension, and ratchet handle.
26. Check valve (9)
Hose (2)
a. Take off tag.
b. Screw on and tighten using 3/4-inch
open-end wrench.
TA243200
2-983
|