Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printed version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-2420-222-20-2 ENGINE OIL PRESSURE SWITCH - CONTINUED ACTION LOCATION ITEM REMARKS INSTALLATION - CONTINUED 8. Engine Start and run at high idle (TM 5-2420-222-10). 9. Flywheel Pressure switch (2) Check for leaks. housing (1) If it is not leaking, skip steps 10 thru 11. 10. Terminal (3) Connector (4) a. Shut off engine (TM 5-2420-222-10). b. Tag (page 2-137). c. Unplug. 11. Flywheel Pressure switch (2) a. Using 1/2-inch drive socket and ratchet housing (1) handle, tighten. b. Start engine (TM 5-2420-222-10). c. Check for leaks. d. If leaking has not stopped, shut down engine (TM 5-2420-222-10) and replace as outlined in this task. 12. Loader backhoe Engine If not already off, shut down (TM 5-2420-222-10). 13. Terminal (3) Connector (4) a. If not already installed, push on. b. If present, take off tag. TASK ENDS HERE TA242940 2-470

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business