TM 5-2420-222-20-2
SPEED GEAR ASSEMBLY (REVERSER) CONTROL LEVER LINKAGE
This task covers:
a.
Removal (page 2-81)
e.
Repair (page 2-820)
b.
Disassembly (page 2-818)
f.
Assembly (page 2-820)
c.
Cleaning (page 2-820)
g.
Installation (page 2-822)
d.
Inspection/Replacement 9page 2-820)
h.
Adjustment (page 2-823)
INITIAL SETUP
Tools
Materials/Parts - Continued
Gage, thickness
Rags, wiping (item 21, Appendix C)
Hammer, ball-peen, 1-pound head
Solvent, drycleaning (item 28, Appendix C)
Pliers, slip-joint
Punch, drive-pin, straight, 1/8-inch
Personnel Required
Screwdriver, flat-tip, 3/16-inch
Threading set, screw One
Vise, machinists
Wrench, adjustable, 0 to 1.322-inch
Equipment Conditions
Wrench, open-end, 1/2-inch
Wrench, open-end, 9/16-inch
1.
Left platform removed (page 2-1060)
2.
Left outer platform ramp removed
Materials/Parts
(page 2-1073)
3.
Right inner platform ramp removed
Pin, cotter, adjustable yoke
(page 2-1095)
Pin, cotter, link
4.
Right platform removed (page 2-1079)
Pin, cotter, headed pin
5.
Center platform support removed
Pin, cotter, control lever rod (page 2-1106)
2-815
|