| |
TM 5-2420-222-20-2
ENGINE STARTING AID SOLENOID LEAD - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION - CONTINUED
26.
Two terminals (1)
Connector (2)
a.
Push on.
b.
Take off tag.
NOTE
FOLLOW-ON MAINTENANCE:
1.
Install right platform (page 2-1079).
2.
Install loader control box door (page 2-1167).
3.
Connect battery ground cable (page 2-696).
TASK ENDS HERE
TA243016
2-618
|