| |
TM 5-2420-222-20-2
ENGINE STARTING AID SOLENOID SWITCH - CONTINUED
NOTE
FOLLOW-ON MAINTENANCE:
1.
Install loader control box door (page 2-1167).
2.
Connect battery ground cable (page 2-696).
TASK ENDS HERE
ENGINE STARTING AID SOLENOID LEAD
This task covers:
a.
Removal (page 2-610)
d.
Repair (page 2-614)
b.
Cleaning (page 2-612)
e.
Installation (page 2-614)
c.
Inspection/Replacement (page 2-614)
INITIAL SETUP
Tools
Personnel Required
Handle, ratchet, 3/8-inch drive
One
Pliers, diagonal-cutting
Pliers, slip-joint
Equipment Condition
Screwdriver, flat-tip, 1/8-inch
Socket, 3/8-inch drive, 1/2-inch
1.
Battery ground cable disconnected
Wrench, box, 1/2-inch (page 2-696)
2.
Loader control box door removed
Materials/Parts
(page 2-1167)
3.
Right platform removed (page 2-1079)
Band, plastic, electrical tiedown
(as required)
Cleaning compound, solvent (item 4,
Appendix C)
Lockwasher, solenoid screw nut
Rags, wiping (item 21, Appendix C)
Solvent, drycleaning (item 28, Appendix C)
Tags, marking (item 30, Appendix C)
2-609
|