|
|
TM 5-2410-237-23
AIR CONDITIONING INSTALLATION INSTRUCTIONS - CONTINUED
0229 03
A/C UNIT INSTALLATION - CONTINUED
WARNING
Use extreme caution when handling heavy parts. Provide adequate support and use assistance during pro-
cedure. Ensure that any lifting device used is in good condition and of suitable load capacity. Keep clear of
heavy parts supported only by lifting device. Failure to follow this warning may cause injury or death.
NOTE
Make sure drain hoses are routed toward rear of machine without pinching.
A/C unit weighs 104 lb (47 kg).
11.
Using lifting equipment, place A/C unit (7) on top of
7
2
15
2
roof (1) and attach two clear drain hoses (13) to under-
side of A/C unit.
12.
Thoroughly clean outside roof area around cutout (14)
and six mounting holes (2).
13.
Apply a thin film of adhesive (provided with A/C unit)
one in. wide around outside surface of cutout (14),
1
around six mounting holes (2) and on bottom of foam
gasket (15).
421-0327
2
14
13
13
2
Change 1
0229 03-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |