Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
INSTALLATION OF MINE CLEARING RAKE (MCR) EAR TO BULLDOZER
BLADE MOLDBOARD - CONTINUED
0229 00
INSTALLATION - CONTINUED
c.
Remove mounting ear (8) with the least stand-off, by removing locknut (12), bolt (11) and retaining pin (10).
d.
Reposition rake assembly and/or machine to close gap between mounting ear (8) and moldboard (9).
NOTE
It may be necessary to lift or lower rear of rake assembly to properly install mounting ear retaining pins.
e.
Trim removed mounting ear (8), as required, by grinding.
f.
Reinstall mounting ear (8) with retaining pin (10), bolt (11) and locknut (12).
g.
With rake mounting ears (8) and retaining pins (10) installed, and before welding, recheck contact points between
mounting ears and moldboard (9). Also check cutting edge (6) and locking hook (1) alignment. Adjust and reposi-
tion as required.
h.
Measure distance between cutting edge (6) and center of mounting ear pin (12). This dimension should be 41.12 in.
(104.4 cm).
i.
When positioning and measurements are correct, clean weld area and tack weld connecting ears (8) to moldboard
(9).
j.
Disconnect rake assembly from moldboard (9) by removing mounting ear locknuts (12), bolts (11) and retaining
pins (10).
10,11,12
8
N.
41.12 I M)
C
(104.4
9
6
387-831
0229 00-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business