Click here to make tpub.com your Home Page

Page Title: INSTALLATION - CONTINUED
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-2410-237-23
INSTALLATION OF ARMOR PACKAGE - CONTINUED
0228 00
INSTALLATION - CONTINUED
Installation of Cab Front Vent Cover and Locking Handle.
13.
NOTE
Hinge bolts require double nuts.
a.
Install front vent cover (237) on outside of cab front with two hinge bolts (238) (3/4 x 5-3/4 in.), four washers
(239) and four nuts (240).
b.
Attach locking handle (241) to vent cover (237) with bolt (242), four washers (243) and nut (244).
c.
Connect locking handle (241) to locking bracket inside cab with locking plunger detente (245) and nut (246).
d.
Attach warning decal (247) inside cab below vent cover opening.
237
243
242 239
240
239
243
245
243
246
244
238
239
241
243
247
387-819
0228 00-25

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business