|
|
TM 5-2410-237-23
HOOD REPLACEMENT - CONTINUED
0159 00
REMOVAL - CONTINUED
5.
Use a lifting device to place hood (4) upside down on work surface.
NOTE
Perform steps 6-10 as needed to removed components from hood.
6.
Remove two nuts (7), four washers (8), two lockwashers (9), capscrews (10) and grabhandle (11) from one side of hood
(4). Discard lockwashers.
7.
Remove cotter pin (12), pin (13) and latch (5) on same side of hood (4). Discard cotter pin.
8.
Repeat steps 6 and 7 on other side of hood (4).
9.
Remove two capscrews (14), lockwashers (15) and brackets (16 and 17). Discard lockwashers.
10.
Repeat step 9 on other side of hood (4).
11
4
13
14 15 17
6
12
16
5
8
7
9
10
8
8
10
387-295
11
INSTALLATION
NOTE
Perform steps 1-5 as needed to install components that were removed from hood.
1.
Install brackets (16 and 17) with two new lockwashers (15) and capscrews (14).
2.
Repeat step 1 on other side of hood (4).
3.
Install latch (5) on one side of hood (4) with pin (13) and new cotter pin (12).
4.
Install grabhandle (11) on same side of hood (4) with two capscrews (10), new lockwashers (9), four washers (8) and
two nuts (7).
5.
Repeat steps 3 and 4 on other side of hood (4).
0159 00-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |