|
|
TM 5-2410-237-23
TRACK ASSEMBLY REPLACEMENT - CONTINUED
0143 00
INSTALLATION
1.
Position machine, with master link (6) one link past bottom center line of sprocket (5).
WARNING
Keep all personnel clear of front and rear of machine during positioning and connection of track ends. At
least 20 ft of clearance is required in front. Stand at side of track when installing master link and bolts. Fail-
ure to follow these precautions could result in serious injury or death.
NOTE
Use tanker bar to keep track taut during installation.
2.
Slowly move machine rearward until track is pulled at least one link past top center line of sprocket.
3.
Position a long bar (10) across track carrier roller (11) and between track and sprocket (5).
4.
Slowly move machine rearward and slowly feed track over front idler (12) and two carrier rollers (11). Use bar (10) to
guide track and move bar along with track. Stop rotation when the first link reaches the 4 o'clock position (8 o'clock
position on left-hand track) on front idler.
10
5
11
12
387-597
387-598
5.
Install chain (13) and links (14) between track links in
14
5
13
ends of track. Leave about 4 in. (10.2 cm) clearance
14
between chain and track pins.
6.
Move machine rearward until bottom link is below a
horizontal line through center of sprocket (5).
387-599
0143 00-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |